DOT is beginning a number of improvements to the Boerum Place corridor, including extending the planted median along Boerum Place to Atlantic Avenue (see the 110 Livingston blog). In addition, the city is installing a network of water catchment basins to prevent overflowing after heavy rains. The crew today was digging up Boerum Place near Livingston Street.
Photo by MK Metz
No comments:
Post a Comment