DOT is beginning a number of improvements to the Boerum Place corridor, including extending the planted median along Boerum Place to Atlantic Avenue (see the 110 Livingston blog). In addition, the city is installing a network of water catchment basins to prevent overflowing after heavy rains. The crew today was digging up Boerum Place near Livingston Street.
Photo by MK Metz
Wednesday, September 19, 2007
Digging Up Boerum Place
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment